Jul 26, 2010

POWER PLANT DESIGN and Benefits

Coal reject and slime Power Plant

The usage of coal rejects coal slime from coal preparation plant and coal mine.
The coal reject and the coal slime are useful as they have certain calorific value. The usage is different according to different calorific value.

Benefit of Coal slime and reject power plant

The coal mining area can achieve the economic cycle as follows:
(1)Coal mine → Coal washing → Clean coal 、middings

→ Coal slime & reject → power generation

(2)Coal slime & reject power generation → Mining area power supply

→ ash→ make Cement, bricks, etc.

(3)Desulphurization 、Efficient dedusting→ Meets emission standard

→ By-product (Gypsum or ammonium salt, etc.)

→ Re-use(Produce gypsum , chemical fertilizer etc. )

The coal mine may realize :Produces the coal → Coal washing

→ Reject power generation → Building materials

→ Chemical industry etc. Forms the circulation economical

industry chain, promotes the mining area economic development



So the total investment is low.



Project Case

We have build approx 80 successful commercial running project in China now.

For more detail please download the following document.

http://www.coalpreparation.cn/show.asp?id=3159 





Subscribe to Biztalk and Jobs via Email
Become a fan Biztalk and Jobs in Facebook
Follow me on Twitter

No comments:

Post a Comment

Subscribe to Biztalk and Jobs via Email

Become a fan Biztalk and Jobs in Facebook

Follow me on Twitter

LinkWithin

Related Posts Plugin for WordPress, Blogger... http://www.sharethis.com/get-sharing-tools/ https://www.philippinepcsolotto.com/lotto-results/lotto-result-december-20-2019-6-58-and-6-45